Build quantities:
4x 2020_double_t_bracket.stl
2x 2020_t_bracket.stl
2x hc300_front_left_t.stl (mirror one to make a front right T bracket)
4x hc300_top_corner.stl
1x alignment_sleeve_bottom.stl
1x alignment_sleeve_top.stl
Make 4 of each bracket and 1 of each sleeve. Use the sleeves to set
alignment for the T-brackets (double-T brackets on bottom, single-T brackets
on top...the sleeves are marked top and bottom) on 620-mm 20mm extrusions,
and secure with M5x8 screws and hammer nuts. Cap the top of the extrusions
with the corner brackets. These are the vertical pieces.
Join pairs of vertical pieces with three 440-mm extrusions, screws, and
nuts. These make the left and right sides.
Join the sides with four 440-mm extrusions, screws, and nuts. This
completes the frame.