In order to accomodate the C93 next to the transformer.
Added top layer GND1 pour under the transformer
shortened the GNDS path.
Signed-off-by: Dominik Sliwa <dominik@sliwa.io>
Cleanup some fill zones.
Updated the Transformer symbol with pin 4, connected to +48V for better
zone fill.
fixed top/bottom transition for the DC_IN_F
Added some gnd vias
Signed-off-by: Dominik Sliwa <dominik@sliwa.io>
Modified PoE layout to account for GNDS-GND1 flow
and repositioned the noise retern capacitor.
Snubber was corrected for the transformer used and the switching
frequency. Some components were removed.
PoE Input filter was adjusted.
3.3 and 5V DCDC capacitor layout was optimised and unused components
were removed.
Signed-off-by: Dominik Sliwa <dominik@sliwa.io>